Level control, alternation and protection for booster sets, transfer pumps and submersible pumps: the complete pump panel with standard units. For pump manufacturers we design custom units with display and ModBus communication.
Featured product
YNDP02 multifunction level control
A single unit for a 2-pump set: conductivity level control with alarm, pump alternation and star-delta starting.
| 7functions | 0 – 50 kΩprobe sensitivity | 230 / 400 VACsupply | 8 Aoutput contacts |
| Functions | Level · alarm · alternation · star-delta |
| Probes | Adjustable detection delay (anti-ripple) |
| Indication | LEDs for operation and probe status |
| Format | 52.5 × 90 × 58.5 mm · 35 mm rail |
| Machine or installation | What to control | Unit |
|---|---|---|
| Submersible pump in a well | Start and stop by level, stop on lack of water | |
| Transfer from well to tank | Minimum well level and maximum tank level | |
| Well or tank with float or probes | Level probes and float switch | |
| 2-pump booster set | Level, alternation and star-delta starting | |
| 2-pump booster set | Alternation to share running hours | |
| Set of 3 to 5 pumps | Alternation and rotation of the start order | |
| Any pump | Dry running and jamming by current | |
| Three-phase pump | Phase sequence and phase failure | |
| Pump above 5.5 kW | Star-delta starting | |
| Pump motor | Operating temperature | |
| Maintenance | Running hours and service schedule |
Need a special function?
For pump manufacturers we design custom units that monitor temperature, hours, flow and maintenance, with display and ModBus communication.
Which unit controls a 2-pump booster set?
The YNDP02 combines level, alarm, alternation and star-delta starting. If level is already handled, an alternation relay such as the TABV02 is enough.
How do I stop a pump from running dry?
With a level control in the well (TNS020, YNS020) and, as a second protection, a ZCIx4xx minimum current relay.
How many pumps can a single unit alternate?
The MRA005 alternates up to 5 pumps with automatic rotation of the start order; the MRA004, up to 4.
See also: Irrigation and purification · Boiler safety · Price list

